Keramika Burgas AD - city of Burgas
“LIMK” Ltd. performs the main construction and assembly works on the expansion of the production facilities of ”Keramica Burgas” AD. The modernization includes the construction of new workshops for clay treatment, armature preparation and production of expanded polystyrene (EPS). There are manufactured and assembled 320 tons of metal constructions, 5400 m2 roof and wall thermo panels, 2300 m2 of polished concrete floorings. The construction and assembly works were done for a period of 11 months.









English (EN)
Srpski (RS)
Български (BG)
Français (FR)
Deutsch (DE)
Română (RO)
